ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle supplies and new parts merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $500k 74k
MMBtu
$7.11
- Electrical $356k 6,597k
kWh
$0.060
- Natural Gas $57k 6.6k
MMBtu
$10.88

41

Recommendations

13.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 15k
MMBtu
19.8%
- Electrical $91k 1,430k
kWh
21.7%
- Natural Gas $11k -
MMBtu
-
Waste $0.9k
Productivity/Other $9.6k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $500k 74k
MMBtu
$7.11
- Electrical $356k 6,597k
kWh
$0.060
- Natural Gas $57k 6.6k
MMBtu
$10.88

14

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 6.8k
MMBtu
9.2%
- Electrical $36k 663k
kWh
10.1%
- Natural Gas $3.5k -
MMBtu
-
Waste $0.9k
Productivity/Other $3.0k
TOTAL $51k