ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Solar loading
NAICS Motor vehicle and motor vehicle parts and supplies merchant wholesalers
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $364k 74k
MMBtu
$6.05
- Electrical $246k 4,312k
kWh
$0.071
- Natural Gas $62k 30k
MMBtu
$7.98

56

Recommendations

11.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 9.8k
MMBtu
13.3%
- Electrical $63k 957k
kWh
22.2%
- Natural Gas $8.2k -
MMBtu
-
Waste $0.5k
Productivity/Other $43k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $398k 59k
MMBtu
$7.14
- Electrical $283k 5,146k
kWh
$0.064
- Natural Gas $50k 6.1k
MMBtu
$9.76

17

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 5.2k
MMBtu
8.8%
- Electrical $27k 507k
kWh
9.8%
- Natural Gas $4.5k -
MMBtu
-
Waste $0.6k
Productivity/Other $2.3k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall