ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Merchant wholesalers, durable goods
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $617k 118k
MMBtu
$9.79
- Electrical $337k 5,889k
kWh
$0.078
- Natural Gas $135k 57k
MMBtu
$7.33

250

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 10.0k
MMBtu
8.4%
- Electrical $53k 972k
kWh
16.5%
- Natural Gas $11k -
MMBtu
-
Waste $2.6k
Productivity/Other $14k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $644k 123k
MMBtu
$9.80
- Electrical $359k 6,262k
kWh
$0.079
- Natural Gas $145k 59k
MMBtu
$7.03

104

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.8k
MMBtu
3.1%
- Electrical $17k 371k
kWh
5.9%
- Natural Gas $3.5k -
MMBtu
-
Waste $1.1k
Productivity/Other $2.8k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall