ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fastener, button, needle, and pin manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,392k 147k
MMBtu
$9.39
- Electrical $518k 6,687k
kWh
$0.074
- Natural Gas $532k 79k
MMBtu
$7.56

69

Recommendations

9.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $600k 34k
MMBtu
22.8%
- Electrical $390k 3,285k
kWh
49.1%
- Natural Gas ($-47.6)k -
MMBtu
-
Waste $7.7k
Productivity/Other ($-40.0)k
TOTAL $568k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,103k 122k
MMBtu
$9.21
- Electrical $374k 5,137k
kWh
$0.072
- Natural Gas $441k 70k
MMBtu
$7.48

22

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 1.2k
MMBtu
1.0%
- Electrical $9.2k 118k
kWh
2.3%
- Natural Gas $12k -
MMBtu
-
Waste $8.9k
Productivity/Other ($0.0)k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall