ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Musical instrument manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $511k 63k
MMBtu
$7.27
- Electrical $360k 4,007k
kWh
$0.071
- Natural Gas $118k 22k
MMBtu
$6.95

34

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 6.2k
MMBtu
9.9%
- Electrical $50k 605k
kWh
15.1%
- Natural Gas $9.4k -
MMBtu
-
Waste -
Productivity/Other $7.1k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $511k 63k
MMBtu
$7.27
- Electrical $360k 4,007k
kWh
$0.071
- Natural Gas $118k 22k
MMBtu
$6.95

16

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.9k
MMBtu
4.6%
- Electrical $22k 284k
kWh
7.1%
- Natural Gas $0.2k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall