ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Gasket, packing, and sealing device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

45

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $692k 85k
MMBtu
$9.09
- Electrical $418k 6,554k
kWh
$0.068
- Natural Gas $104k 16k
MMBtu
$5.90

354

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $80k 8.4k
MMBtu
9.9%
- Electrical $58k 821k
kWh
12.5%
- Natural Gas $1.1k -
MMBtu
-
Waste $2.5k
Productivity/Other $33k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

43

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $716k 88k
MMBtu
$8.91
- Electrical $434k 6,818k
kWh
$0.068
- Natural Gas $108k 16k
MMBtu
$5.71

157

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.0k
MMBtu
2.3%
- Electrical $13k 198k
kWh
2.9%
- Natural Gas $9.4k -
MMBtu
-
Waste -
Productivity/Other $6.2k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall