ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Gasket, packing, and sealing device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $693k 85k
MMBtu
$9.09
- Electrical $422k 6,573k
kWh
$0.069
- Natural Gas $101k 15k
MMBtu
$5.73

366

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 8.5k
MMBtu
10.0%
- Electrical $59k 830k
kWh
12.6%
- Natural Gas $1.0k -
MMBtu
-
Waste $2.4k
Productivity/Other $39k
TOTAL $124k
*May be negative reflecting an increased cost component required to save energy and costs overall

44

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $705k 87k
MMBtu
$9.00
- Electrical $426k 6,688k
kWh
$0.068
- Natural Gas $106k 16k
MMBtu
$5.72

159

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.0k
MMBtu
2.3%
- Electrical $13k 194k
kWh
2.9%
- Natural Gas $9.2k -
MMBtu
-
Waste -
Productivity/Other $6.1k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall