ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

126

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $968k 146k
MMBtu
$9.84
- Electrical $494k 8,888k
kWh
$0.080
- Natural Gas $279k 54k
MMBtu
$6.12

956

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $139k 15k
MMBtu
10.6%
- Electrical $84k 1,511k
kWh
17.0%
- Natural Gas $14k -
MMBtu
-
Waste $1.8k
Productivity/Other $26k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

117

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $996k 153k
MMBtu
$9.55
- Electrical $510k 9,288k
kWh
$0.079
- Natural Gas $290k 56k
MMBtu
$5.93

382

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.3k
MMBtu
1.5%
- Electrical $14k 223k
kWh
2.4%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.2k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall