ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

122

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $995k 151k
MMBtu
$9.60
- Electrical $509k 9,166k
kWh
$0.078
- Natural Gas $287k 55k
MMBtu
$6.01

929

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 16k
MMBtu
10.6%
- Electrical $86k 1,557k
kWh
17.0%
- Natural Gas $14k -
MMBtu
-
Waste $1.8k
Productivity/Other $27k
TOTAL $171k
*May be negative reflecting an increased cost component required to save energy and costs overall

114

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,012k 157k
MMBtu
$9.33
- Electrical $517k 9,494k
kWh
$0.077
- Natural Gas $297k 58k
MMBtu
$5.91

370

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.3k
MMBtu
1.5%
- Electrical $13k 226k
kWh
2.4%
- Natural Gas $9.0k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.3k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall