ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Doll, toy, and game manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 70k
MMBtu
$9.45
- Electrical $407k 4,135k
kWh
$0.061
- Natural Gas $235k 28k
MMBtu
$8.87

57

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.6k
MMBtu
5.2%
- Electrical $23k 355k
kWh
8.6%
- Natural Gas $19k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 70k
MMBtu
$9.45
- Electrical $407k 4,135k
kWh
$0.061
- Natural Gas $235k 28k
MMBtu
$8.87

33

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.4k
MMBtu
2.0%
- Electrical $12k 138k
kWh
3.3%
- Natural Gas $3.3k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $17k
*May be negative reflecting an increased cost component required to save energy and costs overall