ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sporting and athletic goods manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $625k 86k
MMBtu
$8.22
- Electrical $294k 6,153k
kWh
$0.058
- Natural Gas $126k 23k
MMBtu
$6.64

161

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 7.3k
MMBtu
8.5%
- Electrical $37k 711k
kWh
11.6%
- Natural Gas $16k -
MMBtu
-
Waste $4.7k
Productivity/Other $15k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $625k 86k
MMBtu
$8.22
- Electrical $294k 6,153k
kWh
$0.058
- Natural Gas $126k 23k
MMBtu
$6.64

72

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.9k
MMBtu
3.4%
- Electrical $14k 288k
kWh
4.7%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.8k
Productivity/Other $6.0k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall