ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

175

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $841k 124k
MMBtu
$9.26
- Electrical $434k 7,818k
kWh
$0.073
- Natural Gas $230k 43k
MMBtu
$6.35

1,376

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 13k
MMBtu
10.8%
- Electrical $72k 1,305k
kWh
16.7%
- Natural Gas $13k -
MMBtu
-
Waste $2.0k
Productivity/Other $26k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

168

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $850k 127k
MMBtu
$9.23
- Electrical $439k 7,995k
kWh
$0.072
- Natural Gas $231k 44k
MMBtu
$6.29

583

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.5k
MMBtu
2.0%
- Electrical $15k 247k
kWh
3.1%
- Natural Gas $7.2k -
MMBtu
-
Waste $0.7k
Productivity/Other $5.9k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall