ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ophthalmic goods manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,458k 109k
MMBtu
$13.83
- Electrical $1,151k 9,586k
kWh
$0.11
- Natural Gas $73k 11k
MMBtu
$6.49

100

Recommendations

11.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $191k 13k
MMBtu
11.9%
- Electrical $155k 1,261k
kWh
13.2%
- Natural Gas $5.8k -
MMBtu
-
Waste $0.9k
Productivity/Other $0.7k
TOTAL $192k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,612k 120k
MMBtu
$14.24
- Electrical $1,283k 10,645k
kWh
$0.12
- Natural Gas $72k 11k
MMBtu
$6.29

34

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 2.8k
MMBtu
2.4%
- Electrical $52k 278k
kWh
2.6%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall