Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Dental equipment and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $416k 38k
MMBtu
$12.51
- Electrical $257k 3,370k
kWh
$0.090
- Natural Gas $36k 3.7k
MMBtu
$4.41

78

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.0k
MMBtu
13.1%
- Electrical $43k 488k
kWh
14.5%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.6k
Productivity/Other $8.1k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $480k 46k
MMBtu
$10.71
- Electrical $291k 4,031k
kWh
$0.071
- Natural Gas $45k 4.6k
MMBtu
$4.35

25

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 2.3k
MMBtu
5.1%
- Electrical $11k 228k
kWh
5.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall