ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Surgical appliance and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 68k
MMBtu
$9.85
- Electrical $308k 4,377k
kWh
$0.073
- Natural Gas $114k 16k
MMBtu
$5.45

344

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $98k 10.0k
MMBtu
14.7%
- Electrical $68k 975k
kWh
22.3%
- Natural Gas $11k -
MMBtu
-
Waste $0.2k
Productivity/Other $20k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $573k 72k
MMBtu
$9.37
- Electrical $325k 4,625k
kWh
$0.071
- Natural Gas $120k 17k
MMBtu
$5.07

158

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.6k
MMBtu
5.0%
- Electrical $30k 348k
kWh
7.5%
- Natural Gas $2.0k -
MMBtu
-
Waste $0.0k
Productivity/Other $6.3k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall