ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Surgical appliance and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $553k 69k
MMBtu
$9.78
- Electrical $313k 4,443k
kWh
$0.074
- Natural Gas $115k 16k
MMBtu
$5.30

341

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 10k
MMBtu
14.8%
- Electrical $70k 995k
kWh
22.4%
- Natural Gas $11k -
MMBtu
-
Waste $0.2k
Productivity/Other $20k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $580k 73k
MMBtu
$9.46
- Electrical $330k 4,588k
kWh
$0.073
- Natural Gas $125k 18k
MMBtu
$4.88

158

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 3.8k
MMBtu
5.2%
- Electrical $32k 367k
kWh
8.0%
- Natural Gas $2.1k -
MMBtu
-
Waste $0.0k
Productivity/Other $6.7k
TOTAL $48k