ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

334

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $824k 106k
MMBtu
$10.08
- Electrical $478k 7,426k
kWh
$0.079
- Natural Gas $158k 28k
MMBtu
$5.92

2,640

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 14k
MMBtu
13.4%
- Electrical $93k 1,384k
kWh
18.6%
- Natural Gas $6.2k -
MMBtu
-
Waste $2.6k
Productivity/Other $22k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

314

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $842k 110k
MMBtu
$9.92
- Electrical $488k 7,670k
kWh
$0.077
- Natural Gas $163k 29k
MMBtu
$5.83

1,157

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.3k
MMBtu
4.0%
- Electrical $29k 423k
kWh
5.5%
- Natural Gas $4.0k -
MMBtu
-
Waste $0.8k
Productivity/Other $5.2k
TOTAL $47k