ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

341

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $832k 107k
MMBtu
$10.14
- Electrical $482k 7,504k
kWh
$0.079
- Natural Gas $159k 29k
MMBtu
$5.94

2,688

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 16k
MMBtu
14.9%
- Electrical $101k 1,560k
kWh
20.8%
- Natural Gas $3.9k -
MMBtu
-
Waste $2.6k
Productivity/Other $21k
TOTAL $165k
*May be negative reflecting an increased cost component required to save energy and costs overall

322

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $834k 108k
MMBtu
$10.00
- Electrical $485k 7,566k
kWh
$0.078
- Natural Gas $160k 29k
MMBtu
$5.85

1,188

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.3k
MMBtu
4.0%
- Electrical $29k 420k
kWh
5.6%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.7k
Productivity/Other $5.6k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall