ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

340

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $821k 105k
MMBtu
$10.16
- Electrical $476k 7,378k
kWh
$0.079
- Natural Gas $156k 28k
MMBtu
$5.95

2,682

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 14k
MMBtu
13.4%
- Electrical $93k 1,375k
kWh
18.6%
- Natural Gas $6.1k -
MMBtu
-
Waste $2.6k
Productivity/Other $23k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

320

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $838k 108k
MMBtu
$9.98
- Electrical $487k 7,607k
kWh
$0.078
- Natural Gas $161k 29k
MMBtu
$5.87

1,180

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.3k
MMBtu
4.0%
- Electrical $29k 420k
kWh
5.5%
- Natural Gas $3.9k -
MMBtu
-
Waste $0.7k
Productivity/Other $5.4k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall