The ITAC Statistics page displays the average assessment results for the selected criteria.
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $598k | 81k |
MMBtu
|
$8.75 |
- Electrical | $285k | 6,113k |
kWh
|
$0.059 |
- Natural Gas | $170k | 18k |
MMBtu
|
$10.11 |
28
Recommendations
7.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $47k | 2.7k |
MMBtu
|
3.3% |
- Electrical | $21k | 259k |
kWh
|
4.2% |
- Natural Gas | $16k | - |
MMBtu
|
- |
Waste | $20k | |||
Productivity/Other | $3.4k | |||
TOTAL | $70k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $598k | 81k |
MMBtu
|
$8.75 |
- Electrical | $285k | 6,113k |
kWh
|
$0.059 |
- Natural Gas | $170k | 18k |
MMBtu
|
$10.11 |
7
Implemented Recommendations
1.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $7.2k | 0.7k |
MMBtu
|
0.9% |
- Electrical | $4.3k | 73k |
kWh
|
1.2% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.6k | |||
TOTAL | $7.8k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |