ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mattress manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $356k 44k
MMBtu
$9.25
- Electrical $189k 3,624k
kWh
$0.070
- Natural Gas $54k 6.1k
MMBtu
$7.11

111

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 7.5k
MMBtu
16.9%
- Electrical $42k 727k
kWh
20.1%
- Natural Gas $7.3k -
MMBtu
-
Waste -
Productivity/Other $3.9k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $366k 47k
MMBtu
$8.93
- Electrical $187k 3,847k
kWh
$0.065
- Natural Gas $49k 6.2k
MMBtu
$5.82

54

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.7k
MMBtu
7.9%
- Electrical $19k 358k
kWh
9.3%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other $1.2k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall