ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other furniture related product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $402k 51k
MMBtu
$9.15
- Electrical $207k 4,098k
kWh
$0.068
- Natural Gas $76k 8.4k
MMBtu
$7.68

139

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 6.5k
MMBtu
12.8%
- Electrical $38k 638k
kWh
15.6%
- Natural Gas $9.0k -
MMBtu
-
Waste $3.8k
Productivity/Other $3.8k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $418k 54k
MMBtu
$8.89
- Electrical $208k 4,351k
kWh
$0.064
- Natural Gas $76k 8.8k
MMBtu
$6.77

61

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 3.0k
MMBtu
5.6%
- Electrical $15k 295k
kWh
6.8%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $24k
*May be negative reflecting an increased cost component required to save energy and costs overall