ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Office furniture (except wood) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,248k 229k
MMBtu
$10.12
- Electrical $1,727k 17,455k
kWh
$1.13
- Natural Gas $386k 50k
MMBtu
$7.98

93

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $189k 7.3k
MMBtu
3.2%
- Electrical $56k 714k
kWh
4.1%
- Natural Gas $124k -
MMBtu
-
Waste $2.4k
Productivity/Other $0.5k
TOTAL $192k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,543k 258k
MMBtu
$10.28
- Electrical $1,981k 19,893k
kWh
$1.30
- Natural Gas $422k 54k
MMBtu
$8.13

34

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 2.4k
MMBtu
0.9%
- Electrical $20k 230k
kWh
1.2%
- Natural Gas $48k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $71k