ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Office furniture (including fixtures) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

76

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $763k 88k
MMBtu
$9.31
- Electrical $511k 6,386k
kWh
$0.26
- Natural Gas $152k 22k
MMBtu
$7.43

564

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 5.5k
MMBtu
6.3%
- Electrical $38k 539k
kWh
8.4%
- Natural Gas $34k -
MMBtu
-
Waste $2.7k
Productivity/Other $10k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall

68

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $821k 95k
MMBtu
$9.24
- Electrical $556k 6,924k
kWh
$0.28
- Natural Gas $162k 24k
MMBtu
$7.41

263

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.6k
MMBtu
2.7%
- Electrical $17k 249k
kWh
3.6%
- Natural Gas $11k -
MMBtu
-
Waste $2.0k
Productivity/Other $9.3k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall