ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $304k 37k
MMBtu
$8.86
- Electrical $132k 2,342k
kWh
$0.060
- Natural Gas $92k 12k
MMBtu
$7.23

184

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
10.9%
- Electrical $27k 396k
kWh
16.9%
- Natural Gas $13k -
MMBtu
-
Waste $1.3k
Productivity/Other $46k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $302k 37k
MMBtu
$9.01
- Electrical $131k 2,315k
kWh
$0.061
- Natural Gas $91k 12k
MMBtu
$7.14

89

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.2k
MMBtu
3.3%
- Electrical $7.9k 120k
kWh
5.2%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $20k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall