ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Household furniture (except wood and metal) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $671k 87k
MMBtu
$8.58
- Electrical $397k 5,779k
kWh
$0.077
- Natural Gas $192k 28k
MMBtu
$6.88

13

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 3.3k
MMBtu
3.8%
- Electrical $36k 325k
kWh
5.6%
- Natural Gas $6.4k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $671k 87k
MMBtu
$8.58
- Electrical $397k 5,779k
kWh
$0.077
- Natural Gas $192k 28k
MMBtu
$6.88

5

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.8k
MMBtu
3.2%
- Electrical $30k 271k
kWh
4.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall