ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Furniture and related product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

229

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $528k 70k
MMBtu
$9.03
- Electrical $317k 4,761k
kWh
$0.13
- Natural Gas $96k 13k
MMBtu
$7.23

1,716

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 6.6k
MMBtu
9.5%
- Electrical $41k 643k
kWh
13.5%
- Natural Gas $16k -
MMBtu
-
Waste $4.9k
Productivity/Other $17k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall

209

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $547k 73k
MMBtu
$8.98
- Electrical $329k 4,944k
kWh
$0.13
- Natural Gas $98k 13k
MMBtu
$7.14

786

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.3k
MMBtu
3.1%
- Electrical $14k 222k
kWh
4.5%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.8k
Productivity/Other $8.8k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall