ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Furniture and related product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

241

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $525k 69k
MMBtu
$9.26
- Electrical $313k 4,665k
kWh
$0.13
- Natural Gas $95k 13k
MMBtu
$7.10

1,812

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 6.8k
MMBtu
9.8%
- Electrical $44k 660k
kWh
14.2%
- Natural Gas $16k -
MMBtu
-
Waste $4.7k
Productivity/Other $16k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

217

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $543k 72k
MMBtu
$9.04
- Electrical $327k 4,893k
kWh
$0.13
- Natural Gas $99k 13k
MMBtu
$7.21

806

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.2k
MMBtu
3.1%
- Electrical $14k 218k
kWh
4.5%
- Natural Gas $4.2k -
MMBtu
-
Waste $0.8k
Productivity/Other $8.5k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall