ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $638k 67k
MMBtu
$9.49
- Electrical $442k 4,869k
kWh
$0.081
- Natural Gas $117k 17k
MMBtu
$6.56

46

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 5.4k
MMBtu
8.0%
- Electrical $55k 525k
kWh
10.8%
- Natural Gas $8.6k -
MMBtu
-
Waste -
Productivity/Other $20k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $404k 45k
MMBtu
$9.36
- Electrical $230k 3,408k
kWh
$0.074
- Natural Gas $81k 9.8k
MMBtu
$6.71

13

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.5k
MMBtu
3.2%
- Electrical $12k 141k
kWh
4.2%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall