The ITAC Statistics page displays the average assessment results for the selected criteria.
26
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,409k | 199k |
MMBtu
|
$9.28 |
- Electrical | $807k | 13,281k |
kWh
|
$0.073 |
- Natural Gas | $241k | 37k |
MMBtu
|
$7.77 |
189
Recommendations
7.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $353k | 32k |
MMBtu
|
16.3% |
- Electrical | $203k | 3,169k |
kWh
|
23.9% |
- Natural Gas | ($-10.4)k | - |
MMBtu
|
- |
Waste | $1.8k | |||
Productivity/Other | $29k | |||
TOTAL | $383k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
23
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,175k | 176k |
MMBtu
|
$8.98 |
- Electrical | $622k | 11,385k |
kWh
|
$0.068 |
- Natural Gas | $227k | 30k |
MMBtu
|
$8.18 |
74
Implemented Recommendations
3.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $127k | 7.1k |
MMBtu
|
4.0% |
- Electrical | $34k | 695k |
kWh
|
6.1% |
- Natural Gas | ($-2.0)k | - |
MMBtu
|
- |
Waste | $1.4k | |||
Productivity/Other | $9.8k | |||
TOTAL | $139k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |