ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Boat building
SIC 2+ Digits Required
3+ Characters Required for Products

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $351k 39k
MMBtu
$9.52
- Electrical $206k 2,898k
kWh
$0.071
- Natural Gas $66k 9.1k
MMBtu
$3.51

282

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 6.4k
MMBtu
16.2%
- Electrical $48k 624k
kWh
21.5%
- Natural Gas $7.3k -
MMBtu
-
Waste $0.5k
Productivity/Other $41k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $317k 36k
MMBtu
$9.60
- Electrical $201k 2,803k
kWh
$0.072
- Natural Gas $41k 6.3k
MMBtu
$3.32

134

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.1k
MMBtu
8.6%
- Electrical $22k 298k
kWh
10.6%
- Natural Gas $3.6k -
MMBtu
-
Waste $0.2k
Productivity/Other $24k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall