ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Boat building
SIC 2+ Digits Required
3+ Characters Required for Products

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $351k 39k
MMBtu
$9.52
- Electrical $206k 2,898k
kWh
$0.071
- Natural Gas $66k 9.1k
MMBtu
$3.51

282

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 6.4k
MMBtu
16.2%
- Electrical $48k 624k
kWh
21.5%
- Natural Gas $7.3k -
MMBtu
-
Waste $0.5k
Productivity/Other $41k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

34

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $318k 36k
MMBtu
$9.51
- Electrical $197k 2,767k
kWh
$0.071
- Natural Gas $42k 7.1k
MMBtu
$3.29

147

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.0k
MMBtu
8.4%
- Electrical $21k 295k
kWh
10.7%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $23k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall