ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ship building and repairing
SIC 2+ Digits Required
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $481k 55k
MMBtu
$8.78
- Electrical $436k 5,284k
kWh
$0.079
- Natural Gas $3.2k 0.3k
MMBtu
$1.98

164

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 13k
MMBtu
24.3%
- Electrical $107k 1,295k
kWh
24.5%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $6.1k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $481k 55k
MMBtu
$8.78
- Electrical $436k 5,284k
kWh
$0.079
- Natural Gas $3.2k 0.3k
MMBtu
$1.98

79

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 7.5k
MMBtu
13.7%
- Electrical $54k 730k
kWh
13.8%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $2.0k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall