ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ship building and repairing
SIC 2+ Digits Required
3+ Characters Required for Products

27

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $462k 49k
MMBtu
$10.86
- Electrical $412k 4,779k
kWh
$0.093
- Natural Gas $2.8k 0.3k
MMBtu
$2.33

182

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 12k
MMBtu
23.3%
- Electrical $93k 1,123k
kWh
23.5%
- Natural Gas $0.3k -
MMBtu
-
Waste -
Productivity/Other $7.3k
TOTAL $112k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $472k 53k
MMBtu
$8.86
- Electrical $427k 5,159k
kWh
$0.080
- Natural Gas $3.1k 0.3k
MMBtu
$1.90

85

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 7.3k
MMBtu
13.7%
- Electrical $53k 711k
kWh
13.8%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $1.9k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall