ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ship building and repairing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $460k 52k
MMBtu
$8.74
- Electrical $419k 5,081k
kWh
$0.079
- Natural Gas $3.4k 0.3k
MMBtu
$2.07

160

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 13k
MMBtu
23.9%
- Electrical $101k 1,223k
kWh
24.1%
- Natural Gas $0.4k -
MMBtu
-
Waste -
Productivity/Other $6.4k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $477k 55k
MMBtu
$8.45
- Electrical $435k 5,293k
kWh
$0.077
- Natural Gas $3.5k 0.3k
MMBtu
$2.17

74

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 6.8k
MMBtu
12.4%
- Electrical $47k 662k
kWh
12.5%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $2.2k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall