ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ship and boat building
SIC 2+ Digits Required
3+ Characters Required for Products

57

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $393k 44k
MMBtu
$9.22
- Electrical $288k 3,740k
kWh
$0.074
- Natural Gas $42k 5.7k
MMBtu
$2.95

442

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 8.8k
MMBtu
19.7%
- Electrical $68k 855k
kWh
22.9%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.3k
Productivity/Other $27k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

54

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $379k 43k
MMBtu
$9.15
- Electrical $292k 3,771k
kWh
$0.074
- Natural Gas $26k 4.0k
MMBtu
$2.87

208

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.5k
MMBtu
10.5%
- Electrical $32k 440k
kWh
11.7%
- Natural Gas $2.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $15k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall