ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ship and boat building
SIC 2+ Digits Required
3+ Characters Required for Products

58

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $403k 45k
MMBtu
$9.22
- Electrical $297k 3,844k
kWh
$0.075
- Natural Gas $41k 5.6k
MMBtu
$2.90

446

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 9.1k
MMBtu
20.1%
- Electrical $71k 890k
kWh
23.1%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.3k
Productivity/Other $27k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

56

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $374k 42k
MMBtu
$9.21
- Electrical $284k 3,676k
kWh
$0.074
- Natural Gas $27k 4.5k
MMBtu
$2.81

222

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.4k
MMBtu
10.3%
- Electrical $31k 428k
kWh
11.6%
- Natural Gas $2.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $15k
TOTAL $53k