ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Railroad rolling stock manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $858k 146k
MMBtu
$8.79
- Electrical $438k 7,883k
kWh
$0.060
- Natural Gas $205k 66k
MMBtu
$5.89

148

Recommendations

9.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 11k
MMBtu
7.7%
- Electrical $61k 1,100k
kWh
14.0%
- Natural Gas $31k -
MMBtu
-
Waste $0.2k
Productivity/Other $5.3k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $943k 147k
MMBtu
$9.55
- Electrical $482k 8,511k
kWh
$0.064
- Natural Gas $233k 60k
MMBtu
$6.22

60

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 5.5k
MMBtu
3.7%
- Electrical $29k 536k
kWh
6.3%
- Natural Gas $13k -
MMBtu
-
Waste $0.1k
Productivity/Other $4.9k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall