ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Railroad rolling stock manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $858k 146k
MMBtu
$8.79
- Electrical $438k 7,883k
kWh
$0.060
- Natural Gas $205k 66k
MMBtu
$5.89

148

Recommendations

9.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 11k
MMBtu
7.7%
- Electrical $61k 1,100k
kWh
14.0%
- Natural Gas $31k -
MMBtu
-
Waste $0.2k
Productivity/Other $5.3k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $913k 143k
MMBtu
$9.21
- Electrical $436k 7,904k
kWh
$0.061
- Natural Gas $229k 62k
MMBtu
$6.76

52

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.5k
MMBtu
2.4%
- Electrical $16k 338k
kWh
4.3%
- Natural Gas $15k -
MMBtu
-
Waste $0.2k
Productivity/Other $4.7k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall