ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other guided missile and space vehicle parts and auxiliary equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 88k
MMBtu
$7.52
- Electrical $368k 7,575k
kWh
$0.062
- Natural Gas $81k 10k
MMBtu
$6.67

30

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 8.8k
MMBtu
10.1%
- Electrical $38k 863k
kWh
11.4%
- Natural Gas $2.5k -
MMBtu
-
Waste -
Productivity/Other $347k
TOTAL $392k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 88k
MMBtu
$7.52
- Electrical $368k 7,575k
kWh
$0.062
- Natural Gas $81k 10k
MMBtu
$6.67

8

Implemented Recommendations

1.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $10k 1.7k
MMBtu
1.9%
- Electrical $8.6k 165k
kWh
2.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $252k
TOTAL $262k
*May be negative reflecting an increased cost component required to save energy and costs overall