ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Guided missile and space vehicle propulsion unit and propulsion unit parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,936k 249k
MMBtu
$10.83
- Electrical $561k 12,973k
kWh
$0.057
- Natural Gas $846k 102k
MMBtu
$5.38

39

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $383k 29k
MMBtu
11.5%
- Electrical $153k 2,791k
kWh
21.5%
- Natural Gas $84k -
MMBtu
-
Waste $8.2k
Productivity/Other ($-5.7)k
TOTAL $385k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,936k 249k
MMBtu
$10.83
- Electrical $561k 12,973k
kWh
$0.057
- Natural Gas $846k 102k
MMBtu
$5.38

13

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.7k
MMBtu
1.1%
- Electrical $23k 263k
kWh
2.0%
- Natural Gas $0.2k -
MMBtu
-
Waste $7.8k
Productivity/Other $0.1k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall