The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Other aircraft parts and auxiliary equipment manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
139
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $771k | 95k |
MMBtu
|
$10.38 |
- Electrical | $459k | 7,087k |
kWh
|
$0.073 |
- Natural Gas | $107k | 21k |
MMBtu
|
$6.62 |
1,044
Recommendations
7.5
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $118k | 10.0k |
MMBtu
|
10.4% |
- Electrical | $75k | 972k |
kWh
|
13.7% |
- Natural Gas | $7.2k | - |
MMBtu
|
- |
Waste | $1.0k | |||
Productivity/Other | $22k | |||
TOTAL | $141k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
132
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $722k | 89k |
MMBtu
|
$10.30 |
- Electrical | $420k | 6,652k |
kWh
|
$0.073 |
- Natural Gas | $99k | 19k |
MMBtu
|
$6.44 |
475
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $42k | 3.8k |
MMBtu
|
4.2% |
- Electrical | $28k | 366k |
kWh
|
5.5% |
- Natural Gas | $3.0k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $9.0k | |||
TOTAL | $51k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |