ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other aircraft parts and auxiliary equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

137

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $724k 89k
MMBtu
$10.38
- Electrical $424k 6,654k
kWh
$0.073
- Natural Gas $99k 19k
MMBtu
$6.69

1,028

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 9.9k
MMBtu
11.2%
- Electrical $75k 967k
kWh
14.5%
- Natural Gas $4.9k -
MMBtu
-
Waste $1.0k
Productivity/Other $22k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

124

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 89k
MMBtu
$10.06
- Electrical $410k 6,621k
kWh
$0.071
- Natural Gas $100k 19k
MMBtu
$6.22

441

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.7k
MMBtu
4.1%
- Electrical $26k 357k
kWh
5.4%
- Natural Gas $3.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $9.7k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall