ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other aircraft parts and auxiliary equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $125k 17k
MMBtu
$7.46
- Electrical $106k 1,570k
kWh
$0.068
- Natural Gas $6.0k 0.7k
MMBtu
$8.24

13

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 2.2k
MMBtu
13.3%
- Electrical $12k 218k
kWh
13.9%
- Natural Gas $2.9k -
MMBtu
-
Waste -
Productivity/Other $1.3k
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $125k 17k
MMBtu
$7.46
- Electrical $106k 1,570k
kWh
$0.068
- Natural Gas $6.0k 0.7k
MMBtu
$8.24

2

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.1k 0.1k
MMBtu
0.7%
- Electrical $0.9k 11k
kWh
0.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1.1k
*May be negative reflecting an increased cost component required to save energy and costs overall