ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aircraft engine and engine parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

56

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $837k 104k
MMBtu
$9.56
- Electrical $525k 8,617k
kWh
$0.47
- Natural Gas $126k 14k
MMBtu
$7.89

385

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 8.5k
MMBtu
8.2%
- Electrical $51k 832k
kWh
9.7%
- Natural Gas $16k -
MMBtu
-
Waste $0.6k
Productivity/Other $9.9k
TOTAL $93k
*May be negative reflecting an increased cost component required to save energy and costs overall

53

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $843k 106k
MMBtu
$9.39
- Electrical $532k 8,744k
kWh
$0.49
- Natural Gas $132k 14k
MMBtu
$7.90

164

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 2.8k
MMBtu
2.6%
- Electrical $16k 274k
kWh
3.1%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.2k
Productivity/Other $7.9k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall