Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aircraft manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $409k 48k
MMBtu
$9.06
- Electrical $225k 4,099k
kWh
$0.063
- Natural Gas $42k 5.6k
MMBtu
$5.95

237

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 8.0k
MMBtu
16.7%
- Electrical $55k 785k
kWh
19.1%
- Natural Gas $5.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $21k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $441k 53k
MMBtu
$8.49
- Electrical $243k 4,502k
kWh
$0.062
- Natural Gas $46k 6.3k
MMBtu
$5.80

97

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.4k
MMBtu
6.5%
- Electrical $27k 344k
kWh
7.6%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $9.3k
TOTAL $46k