ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

268

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $763k 90k
MMBtu
$10.39
- Electrical $444k 6,927k
kWh
$0.16
- Natural Gas $114k 18k
MMBtu
$6.99

1,970

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $150k 11k
MMBtu
12.2%
- Electrical $83k 1,074k
kWh
15.5%
- Natural Gas $10k -
MMBtu
-
Waste $0.9k
Productivity/Other $32k
TOTAL $183k
*May be negative reflecting an increased cost component required to save energy and costs overall

242

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 94k
MMBtu
$9.99
- Electrical $450k 7,139k
kWh
$0.16
- Natural Gas $120k 19k
MMBtu
$6.79

821

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.6k
MMBtu
3.8%
- Electrical $26k 349k
kWh
4.9%
- Natural Gas $2.6k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall