ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

258

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $752k 91k
MMBtu
$10.22
- Electrical $442k 6,946k
kWh
$0.16
- Natural Gas $115k 18k
MMBtu
$6.97

1,877

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $120k 10.0k
MMBtu
11.0%
- Electrical $72k 972k
kWh
14.0%
- Natural Gas $10k -
MMBtu
-
Waste $0.9k
Productivity/Other $29k
TOTAL $149k
*May be negative reflecting an increased cost component required to save energy and costs overall

236

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $770k 95k
MMBtu
$9.99
- Electrical $453k 7,205k
kWh
$0.17
- Natural Gas $122k 19k
MMBtu
$6.83

796

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.6k
MMBtu
3.7%
- Electrical $26k 348k
kWh
4.8%
- Natural Gas $2.4k -
MMBtu
-
Waste $0.4k
Productivity/Other $14k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall