ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

238

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $736k 91k
MMBtu
$9.95
- Electrical $424k 6,948k
kWh
$0.16
- Natural Gas $115k 18k
MMBtu
$6.86

1,725

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 9.9k
MMBtu
10.9%
- Electrical $69k 964k
kWh
13.9%
- Natural Gas $9.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $25k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall

216

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $742k 93k
MMBtu
$9.66
- Electrical $421k 7,065k
kWh
$0.17
- Natural Gas $121k 18k
MMBtu
$6.56

723

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 3.3k
MMBtu
3.6%
- Electrical $23k 328k
kWh
4.6%
- Natural Gas $2.4k -
MMBtu
-
Waste $0.4k
Productivity/Other $15k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall