ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

261

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $758k 91k
MMBtu
$10.32
- Electrical $445k 6,940k
kWh
$0.16
- Natural Gas $114k 18k
MMBtu
$6.93

1,903

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $126k 10k
MMBtu
11.3%
- Electrical $76k 998k
kWh
14.4%
- Natural Gas $10k -
MMBtu
-
Waste $0.9k
Productivity/Other $29k
TOTAL $156k
*May be negative reflecting an increased cost component required to save energy and costs overall

240

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 94k
MMBtu
$9.96
- Electrical $449k 7,154k
kWh
$0.16
- Natural Gas $121k 19k
MMBtu
$6.83

817

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.6k
MMBtu
3.8%
- Electrical $26k 351k
kWh
4.9%
- Natural Gas $2.7k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall