ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle metal stamping
SIC 2+ Digits Required
3+ Characters Required for Products

66

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $887k 122k
MMBtu
$8.31
- Electrical $545k 9,812k
kWh
$0.060
- Natural Gas $142k 21k
MMBtu
$8.83

526

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 12k
MMBtu
9.4%
- Electrical $64k 1,126k
kWh
11.5%
- Natural Gas $17k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall

61

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $886k 119k
MMBtu
$8.02
- Electrical $555k 9,963k
kWh
$0.059
- Natural Gas $145k 17k
MMBtu
$9.16

162

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.7k
MMBtu
2.3%
- Electrical $16k 265k
kWh
2.7%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $3.6k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall