ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle metal stamping
SIC 2+ Digits Required
3+ Characters Required for Products

72

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $915k 123k
MMBtu
$8.36
- Electrical $580k 10,052k
kWh
$0.061
- Natural Gas $135k 20k
MMBtu
$9.18

562

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $127k 15k
MMBtu
11.8%
- Electrical $89k 1,420k
kWh
14.1%
- Natural Gas $16k -
MMBtu
-
Waste $0.3k
Productivity/Other $10k
TOTAL $138k
*May be negative reflecting an increased cost component required to save energy and costs overall

64

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $936k 124k
MMBtu
$8.01
- Electrical $582k 10,400k
kWh
$0.059
- Natural Gas $148k 17k
MMBtu
$9.23

167

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.6k
MMBtu
2.1%
- Electrical $15k 257k
kWh
2.5%
- Natural Gas $4.2k -
MMBtu
-
Waste $0.1k
Productivity/Other $3.4k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall