ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle transmission and power train parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

43

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,371k 214k
MMBtu
$7.26
- Electrical $789k 15,835k
kWh
$0.054
- Natural Gas $304k 51k
MMBtu
$7.47

369

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 14k
MMBtu
6.5%
- Electrical $80k 1,350k
kWh
8.5%
- Natural Gas $41k -
MMBtu
-
Waste $3.1k
Productivity/Other $12k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,363k 212k
MMBtu
$7.28
- Electrical $794k 15,722k
kWh
$0.055
- Natural Gas $301k 51k
MMBtu
$7.50

159

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.4k
MMBtu
3.0%
- Electrical $31k 622k
kWh
4.0%
- Natural Gas $23k -
MMBtu
-
Waste $1.7k
Productivity/Other $2.4k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall