ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle transmission and power train parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,390k 218k
MMBtu
$7.16
- Electrical $800k 16,112k
kWh
$0.053
- Natural Gas $311k 52k
MMBtu
$7.46

361

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $144k 14k
MMBtu
6.4%
- Electrical $80k 1,361k
kWh
8.4%
- Natural Gas $42k -
MMBtu
-
Waste $3.2k
Productivity/Other $12k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,347k 216k
MMBtu
$7.03
- Electrical $788k 16,162k
kWh
$0.052
- Natural Gas $306k 51k
MMBtu
$7.50

142

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 6.7k
MMBtu
3.1%
- Electrical $32k 658k
kWh
4.1%
- Natural Gas $26k -
MMBtu
-
Waste $1.9k
Productivity/Other $2.7k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall