ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,043k 152k
MMBtu
$7.69
- Electrical $632k 13,435k
kWh
$0.052
- Natural Gas $86k 14k
MMBtu
$7.49

224

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 12k
MMBtu
7.7%
- Electrical $57k 1,138k
kWh
8.5%
- Natural Gas $13k -
MMBtu
-
Waste $2.1k
Productivity/Other $2.4k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

25

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $988k 146k
MMBtu
$7.56
- Electrical $614k 12,736k
kWh
$0.050
- Natural Gas $90k 15k
MMBtu
$7.49

89

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.5k
MMBtu
2.4%
- Electrical $16k 337k
kWh
2.6%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall