ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle gasoline engine and engine parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,459k 226k
MMBtu
$7.78
- Electrical $883k 18,966k
kWh
$0.054
- Natural Gas $192k 32k
MMBtu
$8.52

290

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $162k 25k
MMBtu
10.9%
- Electrical $124k 2,400k
kWh
12.7%
- Natural Gas $13k -
MMBtu
-
Waste $7.4k
Productivity/Other $28k
TOTAL $198k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,413k 222k
MMBtu
$7.47
- Electrical $880k 18,682k
kWh
$0.053
- Natural Gas $182k 30k
MMBtu
$8.91

126

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 13k
MMBtu
6.0%
- Electrical $77k 1,308k
kWh
7.0%
- Natural Gas $4.8k -
MMBtu
-
Waste $3.0k
Productivity/Other $21k
TOTAL $116k
*May be negative reflecting an increased cost component required to save energy and costs overall