ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

420

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,085k 180k
MMBtu
$9.21
- Electrical $629k 13,226k
kWh
$0.13
- Natural Gas $175k 30k
MMBtu
$7.34

3,372

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $125k 15k
MMBtu
8.5%
- Electrical $75k 1,487k
kWh
11.2%
- Natural Gas $17k -
MMBtu
-
Waste $3.4k
Productivity/Other $15k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

384

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,068k 178k
MMBtu
$9.28
- Electrical $620k 13,243k
kWh
$0.13
- Natural Gas $173k 29k
MMBtu
$7.37

1,344

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 6.1k
MMBtu
3.4%
- Electrical $27k 591k
kWh
4.5%
- Natural Gas $6.7k -
MMBtu
-
Waste $0.9k
Productivity/Other $6.9k
TOTAL $50k