ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

427

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,093k 181k
MMBtu
$9.26
- Electrical $631k 13,226k
kWh
$0.13
- Natural Gas $181k 31k
MMBtu
$7.33

3,432

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $125k 15k
MMBtu
8.4%
- Electrical $76k 1,485k
kWh
11.2%
- Natural Gas $17k -
MMBtu
-
Waste $3.5k
Productivity/Other $15k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

398

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,079k 178k
MMBtu
$9.28
- Electrical $627k 13,188k
kWh
$0.13
- Natural Gas $177k 30k
MMBtu
$7.36

1,402

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 6.0k
MMBtu
3.4%
- Electrical $27k 585k
kWh
4.4%
- Natural Gas $6.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $6.8k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall