ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

457

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,089k 177k
MMBtu
$9.29
- Electrical $634k 12,932k
kWh
$0.12
- Natural Gas $179k 31k
MMBtu
$7.42

3,672

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 15k
MMBtu
8.7%
- Electrical $79k 1,497k
kWh
11.6%
- Natural Gas $17k -
MMBtu
-
Waste $3.4k
Productivity/Other $16k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

418

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,082k 180k
MMBtu
$9.24
- Electrical $625k 13,125k
kWh
$0.13
- Natural Gas $177k 30k
MMBtu
$7.40

1,451

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 6.0k
MMBtu
3.3%
- Electrical $27k 585k
kWh
4.5%
- Natural Gas $6.5k -
MMBtu
-
Waste $1.3k
Productivity/Other $7.0k
TOTAL $50k