ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Travel trailer and camper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $492k 68k
MMBtu
$7.23
- Electrical $190k 3,957k
kWh
$0.046
- Natural Gas $232k 27k
MMBtu
$7.16

32

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 5.3k
MMBtu
7.9%
- Electrical $18k 520k
kWh
13.1%
- Natural Gas $42k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $492k 68k
MMBtu
$7.23
- Electrical $190k 3,957k
kWh
$0.046
- Natural Gas $232k 27k
MMBtu
$7.16

11

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.7k
MMBtu
5.4%
- Electrical $12k 356k
kWh
9.0%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall