ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle body manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

59

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $835k 110k
MMBtu
$8.75
- Electrical $453k 7,820k
kWh
$0.065
- Natural Gas $221k 29k
MMBtu
$8.06

433

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 11k
MMBtu
10.3%
- Electrical $73k 1,101k
kWh
14.1%
- Natural Gas $21k -
MMBtu
-
Waste $2.4k
Productivity/Other $16k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall

56

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $814k 108k
MMBtu
$8.67
- Electrical $432k 7,644k
kWh
$0.064
- Natural Gas $214k 29k
MMBtu
$7.72

182

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.2k
MMBtu
2.9%
- Electrical $18k 310k
kWh
4.1%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.0k
Productivity/Other $8.3k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall