ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle body and trailer manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

83

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $723k 95k
MMBtu
$8.93
- Electrical $379k 6,603k
kWh
$0.065
- Natural Gas $207k 26k
MMBtu
$8.00

634

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 9.4k
MMBtu
10.0%
- Electrical $58k 920k
kWh
13.9%
- Natural Gas $21k -
MMBtu
-
Waste $2.1k
Productivity/Other $12k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $727k 96k
MMBtu
$8.68
- Electrical $373k 6,660k
kWh
$0.063
- Natural Gas $209k 27k
MMBtu
$7.69

267

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.4k
MMBtu
3.5%
- Electrical $18k 330k
kWh
5.0%
- Natural Gas $7.1k -
MMBtu
-
Waste $0.0k
Productivity/Other $6.4k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall