ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Heavy duty truck manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,071k 170k
MMBtu
$8.65
- Electrical $571k 10,954k
kWh
$0.058
- Natural Gas $327k 57k
MMBtu
$6.48

162

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $165k 16k
MMBtu
9.7%
- Electrical $95k 1,602k
kWh
14.6%
- Natural Gas $52k -
MMBtu
-
Waste $0.6k
Productivity/Other $23k
TOTAL $189k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,125k 179k
MMBtu
$8.63
- Electrical $602k 11,544k
kWh
$0.059
- Natural Gas $344k 60k
MMBtu
$6.55

65

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 7.8k
MMBtu
4.4%
- Electrical $38k 763k
kWh
6.6%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $76k