ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 336112 Light truck and utility vehicle manufacturing

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $9,440k 1,486k
MMBtu
$7.99
- Electrical $7,532k 114,991k
kWh
$0.066
- Natural Gas $1,624k 308k
MMBtu
$4.85

38

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $368k 40k
MMBtu
2.7%
- Electrical $267k 3,933k
kWh
3.4%
- Natural Gas $95k -
MMBtu
-
Waste -
Productivity/Other $3.9k
TOTAL $372k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $9,440k 1,486k
MMBtu
$7.99
- Electrical $7,532k 114,991k
kWh
$0.066
- Natural Gas $1,624k 308k
MMBtu
$4.85

20

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 7.2k
MMBtu
0.5%
- Electrical $51k 706k
kWh
0.6%
- Natural Gas $5.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall