ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Automobile manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,931k 338k
MMBtu
$8.09
- Electrical $1,033k 23,859k
kWh
$0.061
- Natural Gas $527k 93k
MMBtu
$7.11

135

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $231k 29k
MMBtu
8.7%
- Electrical $171k 2,854k
kWh
12.0%
- Natural Gas $40k -
MMBtu
-
Waste $5.4k
Productivity/Other $0.4k
TOTAL $236k
*May be negative reflecting an increased cost component required to save energy and costs overall

13

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,140k 377k
MMBtu
$8.19
- Electrical $1,155k 26,748k
kWh
$0.063
- Natural Gas $585k 103k
MMBtu
$7.25

63

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 6.1k
MMBtu
1.6%
- Electrical $29k 595k
kWh
2.2%
- Natural Gas $12k -
MMBtu
-
Waste $2.6k
Productivity/Other ($-0.2)k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall