The ITAC Statistics page displays the average assessment results for the selected criteria.
21
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $4,077k | 666k |
MMBtu
|
$8.06 |
- Electrical | $2,889k | 49,896k |
kWh
|
$0.062 |
- Natural Gas | $840k | 155k |
MMBtu
|
$6.46 |
173
Recommendations
8.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $270k | 32k |
MMBtu
|
4.9% |
- Electrical | $198k | 3,162k |
kWh
|
6.3% |
- Natural Gas | $56k | - |
MMBtu
|
- |
Waste | $3.9k | |||
Productivity/Other | $1.4k | |||
TOTAL | $275k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
21
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $4,077k | 666k |
MMBtu
|
$8.06 |
- Electrical | $2,889k | 49,896k |
kWh
|
$0.062 |
- Natural Gas | $840k | 155k |
MMBtu
|
$6.46 |
86
Implemented Recommendations
4.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $50k | 5.9k |
MMBtu
|
0.9% |
- Electrical | $32k | 573k |
kWh
|
1.1% |
- Natural Gas | $10k | - |
MMBtu
|
- |
Waste | $1.6k | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $51k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |