ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,632k 427k
MMBtu
$8.39
- Electrical $1,779k 31,190k
kWh
$0.061
- Natural Gas $590k 107k
MMBtu
$6.50

342

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $219k 25k
MMBtu
5.7%
- Electrical $148k 2,394k
kWh
7.7%
- Natural Gas $54k -
MMBtu
-
Waste $2.3k
Productivity/Other $11k
TOTAL $232k
*May be negative reflecting an increased cost component required to save energy and costs overall

38

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,756k 448k
MMBtu
$8.32
- Electrical $1,866k 32,739k
kWh
$0.061
- Natural Gas $618k 112k
MMBtu
$6.50

151

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 6.7k
MMBtu
1.5%
- Electrical $35k 658k
kWh
2.0%
- Natural Gas $11k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.2k
TOTAL $62k