ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Motor vehicle manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,690k 437k
MMBtu
$8.33
- Electrical $1,819k 31,923k
kWh
$0.060
- Natural Gas $603k 109k
MMBtu
$6.47

335

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $222k 25k
MMBtu
5.7%
- Electrical $151k 2,442k
kWh
7.7%
- Natural Gas $54k -
MMBtu
-
Waste $2.4k
Productivity/Other $11k
TOTAL $235k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,816k 458k
MMBtu
$8.31
- Electrical $1,911k 33,483k
kWh
$0.061
- Natural Gas $633k 115k
MMBtu
$6.47

148

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 6.9k
MMBtu
1.5%
- Electrical $36k 674k
kWh
2.0%
- Natural Gas $10k -
MMBtu
-
Waste $0.9k
Productivity/Other $7.4k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall