The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | All other miscellaneous electrical equipment and component manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
20
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $590k | 73k |
MMBtu
|
$9.73 |
- Electrical | $418k | 5,535k |
kWh
|
$0.091 |
- Natural Gas | $92k | 13k |
MMBtu
|
$6.58 |
168
Recommendations
8.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $63k | 4.8k |
MMBtu
|
6.7% |
- Electrical | $40k | 473k |
kWh
|
8.5% |
- Natural Gas | $8.3k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $25k | |||
TOTAL | $90k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
18
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $617k | 75k |
MMBtu
|
$10.15 |
- Electrical | $435k | 5,640k |
kWh
|
$0.096 |
- Natural Gas | $94k | 14k |
MMBtu
|
$6.34 |
64
Implemented Recommendations
3.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 1.3k |
MMBtu
|
1.8% |
- Electrical | $10k | 128k |
kWh
|
2.3% |
- Natural Gas | $0.3k | - |
MMBtu
|
- |
Waste | $1.0k | |||
Productivity/Other | $15k | |||
TOTAL | $34k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |