ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

49

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,162k 191k
MMBtu
$9.86
- Electrical $542k 11,193k
kWh
$0.078
- Natural Gas $351k 52k
MMBtu
$5.95

386

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $148k 8.9k
MMBtu
4.6%
- Electrical $49k 867k
kWh
7.7%
- Natural Gas $81k -
MMBtu
-
Waste $9.2k
Productivity/Other $21k
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall

41

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,198k 205k
MMBtu
$9.28
- Electrical $585k 12,026k
kWh
$0.078
- Natural Gas $354k 52k
MMBtu
$6.24

122

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 2.5k
MMBtu
1.2%
- Electrical $11k 244k
kWh
2.0%
- Natural Gas $8.5k -
MMBtu
-
Waste $2.4k
Productivity/Other $8.6k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall