ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other electrical equipment and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,137k 179k
MMBtu
$9.31
- Electrical $596k 12,206k
kWh
$0.079
- Natural Gas $347k 51k
MMBtu
$6.36

324

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $160k 9.6k
MMBtu
5.4%
- Electrical $52k 938k
kWh
7.7%
- Natural Gas $94k -
MMBtu
-
Waste $2.5k
Productivity/Other $15k
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall

38

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,205k 189k
MMBtu
$9.41
- Electrical $626k 12,904k
kWh
$0.080
- Natural Gas $370k 55k
MMBtu
$6.15

115

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
1.4%
- Electrical $12k 259k
kWh
2.0%
- Natural Gas $9.0k -
MMBtu
-
Waste $2.5k
Productivity/Other $9.3k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall